OUR SERVICES
Our Group specialises in providing comprehensive Mechanical and Electrical (M&E) engineering services across industrial, commercial, residential properties, and solar facilities. We focus on project planning, procurement, installation, quality assurance, and post-handover maintenance, collaborating with main contractors and project owners. Additionally, we began generating revenue from renewable energy operations in 2024, providing tailored solutions for corporate consumers. Operating exclusively in Malaysia, our commitment is to deliver efficient, high-quality engineering and energy solutions to meet our clients’ needs. Our core services include:
Electrical Engineering Services for Electricity Supply Distribution Systems

High Voltage (HV), Medium Voltage (MV), Low Voltage (LV), and Extra Low Voltage (ELV) electrical services.
Earthingsystems.
Cablingandwiring.
Accesscontrolsystems.
Lightingsystems.
Lightningprotectionsystems.
Securitysystems.
Mechanical Engineering Services for Building Systems

- Air Conditioning and Mechanical Ventilation (ACMV) systems.
- Communication systems.
Fire protection systems.

Solar PV Plants
Generation and Sales of Renewable Energy

Renewable energy operations.
Maintenance of renewable energy systems.
Junjong LSSPV Plant
On 2 September 2020, the Junjong Consortium submitted a proposal to participate in the development of the Junjong LSSPV Plant. On 12 March 2021, the Junjong Consortium was selected as the shortlisted bidder by the EC for the development of the Junjong LSSPV Plant. On 8 April 2021, Energy ES was incorporated by the Junjong Consortium, to undertake the development and operations of the Junjong LSSPV Plant.
The Junjong LSSPV Plant is connected to TNB’s existing Pencawang Masuk Utama (main incoming substation) located approximately 10.0km through a set of 33kV overhead transmission lines and underground cables at Simpang Ampat East, Pulau Pinang.
In conjunction with the development and operations of the Junjong LSSPV Plant, Energy ES and Yansnest had on 1 July 2021 entered into the lease agreement for the lease of Junjong Land for a tenure of 25 years, commencing on 24 July 2023 and expiring on 23 July 2048.

Selarong LSSPV Plant
On 7 November 2022, the Government launched the CGPP, a renewable energy initiative to provide opportunities for business entities to participate in the promotion and use of renewable energy in their business operation. The CGPP also allows corporate consumers to virtually purchase solar energy from solar power producer (“SPP”) through the use of virtual power purchase agreements or corporate green power agreements. CGPP is essentially a mechanism of virtual power purchase agreement, which is implemented using the existing NEDA framework.
The EC has been entrusted by PETRA to implement the CGPP and to set for commercial operations by 2025 under NEDA. The CGPP requires an eligible corporate consumer to have an agreement with SPP for the virtual sale and purchase of renewable energy produced by the solar PV plant. The application for the CGPP commenced from 7 November 2022 until 31 December 2023 or until the total allocation quota of 800MW is fully subscribed. On 7 August 2023, the consortium comprising Savelite, TRe and Blazing Solar received the letter of offer from the EC for Selarong LSSPV Plant with export capacity of 29.99MW, of which the consortium has acknowledged the terms stated in the notification letter from the EC on 18 August 2023.
On 17 January 2024, Savelite had entered into a joint venture and shareholder agreement with TRe and Blazing Solar to jointly collaborate for the development, construction and operations of Selarong LSSPV Plant. Subsequently, Selarong Pertama was incorporated on 31 January 2024 as the joint venture company.

Quick Link
Contact
2A, Jalan Industri Tangkas 2,Taman Industri Tangkas,14000 Bukit Mertajam, Seberang Perai Tengah, Pulau Pinang.
04-508 8272
info@essunlogy.com
Copyright 2025 © ES SUNLOGY BERHAD(1540381T). All Rights Reserved. Website by Dot Connect Studio